| HOME | ABOUT | MEMBERSHIP | NEWS & ANNOUNCEMENTS | MEETINGS | FAQ | CONTACT US | | Powered by American National Standards Institute |
![]() |
Return to detail page at www.hitsp.org | HITSP/SC108 |
| Prev TOC |
The following sections provide the history of all changes made to this document.
No changes. This is the first published version of the document.
Upon approval by the HITSP Panel on July 8, 2009, this document is now Released for Implementation.
[1] Optionality = R for Required, R2 for Required if Known or O for Optional, or C for Conditional
[2] Note the access control service can request the consents directly from a consent directive registry.
[3] Steps that do not list specific constructs or interfaces are internal to the HITSP/SC108 Access Control and do not reference an interface within an underlying construct. This is considered a loopback.
![]() |
Return to detail page at www.hitsp.org | HITSP/SC108 |
| Prev TOC |